Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/html/wp-includes/functions.php on line 6260 Greif Invests in New Paint Line at Warminster, PA Drum Facility - Ink World Magazine
Industry News, Suppliers News

Greif Invests in New Paint Line at Warminster, PA Drum Facility

Optimized drum transport system and filtration and air movement systems within the paint booth.

Greif, a global leader in industrial packaging products and services, announces the completion of a major capital improvement to its steel drum paint line at its Warminster, PA facility.
 
The new paint line for the steel drum plant in Warminster, PA will become operational by late September. This multi-million dollar state-of-the-art paint line was internally designed by Mike Morrison, regional engineering manager and Mike Cooper, senior system integrator, along with others.
 
“This project was a team effort, which enabled us to consider the environmental requirements and physical constraints of the plant,” said Morrison. “We were able to optimize the drum transport system and the filtration and air movement systems within the paint booth. The design allows for ease of use for the operators, intuitive adjustments, quick changeovers, effective cleanup and ease of maintenance.” 

Add us as a preferred source on Google

Get the latest Ink World magazine news, insights and analysis in your Google Search and AI experiences.

Keep Up With Our Content. Subscribe To Ink World magazine Newsletters